VärvipoodPony Luxury Coating
Pony L11000 (11x5x5)
Värvipood
Pony Luxury Coating
Pony L11000 (11x5x5)
Tootmisaasta
2025
Seisund
Uus
Asukoht
Würzburg 

Pildid näitavad
Kuva kaart
Andmed masina kohta
- Masina nimetus:
- Värvipood
- Tootja:
- Pony Luxury Coating
- Mudel:
- Pony L11000 (11x5x5)
- Tootmisaasta:
- 2025
- Seisund:
- uus
- Töövõimekus:
- täielikult töökorras
Hind ja asukoht
- Asukoht:
- Schulstr 3, 97084 Würzburg, Deutschland

Helistada
Tehnilised andmed
- Kogukõrgus:
- 5 600 mm
- Kogupikkus:
- 11 200 mm
- Kogulaius:
- 5 100 mm
- Sisendtüüpi vool:
- kolmefaasiline
- Garantii kestus:
- 24 kuud
- Sisekõrgus:
- 4 970 mm
- Sisepikkus:
- 11 000 mm
- Temperatuur:
- 80 °C
- Sisemine laius:
- 5 000 mm
- Õhuvajadus:
- 52 000 m³/h
- Sisendpinge:
- 380 V
- Küttevõimsus:
- 250 kW (339,91 hj)
- Võimsus:
- 45 kW (61,18 hj)
- Kütus:
- vedel naftagaas (LPG)
- Sisendsagedus:
- 50 Hz
- Energiatarbimine:
- 45 kWh
- Isolatsiooni paksus:
- 50 mm
- Nimivõimsus:
- 250 kW (339,91 hj)
- Lehe paksus teras (maks.):
- 2 mm
- Varustus:
- valgustus
Pakkumise üksikasjad
- kuulutuse ID:
- A19572531
- Värskendus:
- viimati kuupäeval 07.10.2025
Kirjeldus
* Air Preparation Unit:
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
Lodpfowzl Hxex Abketa
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.
The air preparation unit is a recirculation system that supplies the cabin with filtered fresh air and exhausts used air during the painting process. It heats the air to 60 °C, mixes the used air with 10% fresh air via an automatic multi-damper system, and reheats the air before routing it back into the cabin. The air is heated using a burner and a heat exchanger, both made of high-quality 304 stainless steel and housed within the fresh air unit. During painting, the air is filtered twice (via front and ceiling filters) before it enters the cabin. The contaminated air is also filtered twice (through inlet and outlet filters) before it exits via the exhaust unit. Air preparation units are insulated like the side walls to minimize heat loss and are protected against potential vibration and noise thanks to rubber seals on the covers. The exhaust air is regulated by a damper in the outlet duct, which helps control the internal pressure of the cabin.
* PRINCIPLES OF CABIN OPERATION:
The processes in the cabin are controlled via a control panel that manages the following steps:
* PAINTING PROCESS:
During painting, 100% fresh air is drawn in from outside and passed through front filters before entering the distribution chamber at ambient temperature. The air is then expelled by the extraction unit. Floor filters (paint stops) capture paint particles, and the air passes through the final exhaust filters before being discharged.
* FLASH-OFF PROCESS:
After painting, the cabin operates for approximately 15 more minutes to purge residual solvents and thinners. During this phase, fresh air from outside continues to circulate in the cabin.
* DRYING PROCESS:
In this phase, 80% of the air passing through the cabin is heated to 60 °C and supplied to the cabin via a distributor. As 20% of the solvent is released during drying, these solvents are expelled with the exhaust air. Industrial coatings are typically dried at 60 °C, but the cabin temperature can be adjusted via the control panel as required.
* COOLING PROCESS:
After the 30-minute drying process, the coil is deactivated via the control panel, the pneumatic damper closes, and the extraction system restarts. During the 5-minute cooling phase, fresh air from outside circulates in the cabin, after which the system stops automatically.
ELECTRICAL AND ELECTRONIC EQUIPMENT:
These control panels manage the functions and operation of all machinery and devices inside the cabin. The control panel is constructed from durable galvanized sheet metal and steel profiles and is fully enclosed to protect against dust and moisture.
Electrical devices and control panels:
• The control panel contains essential components such as circuit breakers, fuses, indicator lamps, thermal relays, contactors, and connectors.
Lodpfowzl Hxex Abketa
• Heat-resistant cables are used for command and control lines between the panel and motors or other electrical devices.
• Electrical wiring is designed to allow for cabin relocation if necessary.
• Operating devices use 380 V 50 Hz, while control devices use 220 V.
Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.
Dokumendid
Pakkuja
Märkus: Registreeru tasuta või logi sisse, et saada kogu teave.
Registreeritud alates: 2025
Saada päring
Telefon & Faks
+49 176 7... kuulutused
Need kuulutused võivad samuti teile huvi pakkuda.
Väike kuulutus
Velen
1 363 km
Käsitööriistad
HBMKrimpzange Akku
HBMKrimpzange Akku
Väike kuulutus
Wielka Nieszawka
744 km
PULKKRAANA 5T - UUS
WNM Sp. Z O.O.
WNM Sp. Z O.O.
Väike kuulutus
Luckenwalde
1 041 km
Samm-sammult märgmaalingute süsteemid
PROTONSTP-STP
PROTONSTP-STP
Väike kuulutus
Büyükkayacık OSB
2 359 km
Madallaadur
GVN Trailer3 Axle Hydraulic Platform Lowbed
GVN Trailer3 Axle Hydraulic Platform Lowbed
Väike kuulutus
Nettetal
1 442 km
Pulberahi
KM IndustrieserviceElektro Kammerofen KM Pro
KM IndustrieserviceElektro Kammerofen KM Pro
Väike kuulutus
Parma
1 827 km
Madala laaduriga ehitusmasinad
CEYLAN carrellone rampe idrauliche nuovo
CEYLAN carrellone rampe idrauliche nuovo
Väike kuulutus
Malax
514 km
Giardini GST UV kuivatustunnel
GiardinaGST 1401/3+2
GiardinaGST 1401/3+2
Väike kuulutus
Büyükkayacık OSB
2 359 km
Madallaadur
GVN Trailer3 Axle Tramex Platform Lowbed
GVN Trailer3 Axle Tramex Platform Lowbed
Väike kuulutus
Itaalia
1 912 km
Värvi viimistlussüsteem
HAS KİM İNŞAAT VE MAKİNE KİMYEVİ MADDE SPowder Coating Plant - Automatic
HAS KİM İNŞAAT VE MAKİNE KİMYEVİ MADDE SPowder Coating Plant - Automatic
Väike kuulutus
Calden
1 274 km
Energia salvestamine
ProtonProton Energiespeicher EC-100&230
ProtonProton Energiespeicher EC-100&230
Teie kuulutus on edukalt kustutatud
Ilmnes viga















































































