Ameise alusesiirdur Jungheinrich ERC 214Jungheinrich
Ameise Jungheinrich ERC 214
Ameise alusesiirdur Jungheinrich ERC 214
Jungheinrich
Ameise Jungheinrich ERC 214
VB lisandub käibemaks
1 100 €
Tootmisaasta
2006
Seisund
Kasutatud
Asukoht
Sinntal 

Pildid näitavad
Kuva kaart
Andmed masina kohta
- Masina nimetus:
- Ameise alusesiirdur Jungheinrich ERC 214
- Tootja:
- Jungheinrich
- Tootmisaasta:
- 2006
- Seisund:
- vajab remonti (kasutatud)
- Töövõimekus:
- mitte töökorras
- Tööajad:
- 9 455 h
Hind ja asukoht
VB lisandub käibemaks
1 100 €
- Asukoht:
- Sinntal, Saksamaa

Tehnilised andmed
- Kandevõime:
- 1 400 kg
- Aku pingepinge:
- 24 V
- Aku kaal:
- 274 kg
Pakkumise üksikasjad
- kuulutuse ID:
- A21731193
- Värskendus:
- viimati kuupäeval 16.04.2026
Kirjeldus
Ameise Jungheinrich ERC 214
The pallet truck is currently not operational:
Drive switch defective, new battery required
General terms and conditions for the offer:
- 100% payment in advance, net without deduction, before dismantling begins and upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The purchaser may withdraw from the purchase agreement at any time in writing and without stating reasons until full payment has been made.
- Ex stock location, the buyer is responsible for organizing dismantling, loading, and transport of the equipment at their own expense.
- The buyer is responsible for proper dismantling and commissioning.
- The buyer undertakes to contract only qualified specialists for dismantling.
- Dates must be coordinated with KT and adapted to the plant’s operating hours.
- Dismantling must be completed entirely up to the supply lines.
Iiedpfx Aey Dg N Heb Ssa
- All site safety regulations must be observed.
- The equipment is sold as inspected and in its current condition, without any guarantee or warranty for material or cosmetic defects.
Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.
The pallet truck is currently not operational:
Drive switch defective, new battery required
General terms and conditions for the offer:
- 100% payment in advance, net without deduction, before dismantling begins and upon receipt of invoice.
- The equipment remains our property until full payment has been received.
- The purchaser may withdraw from the purchase agreement at any time in writing and without stating reasons until full payment has been made.
- Ex stock location, the buyer is responsible for organizing dismantling, loading, and transport of the equipment at their own expense.
- The buyer is responsible for proper dismantling and commissioning.
- The buyer undertakes to contract only qualified specialists for dismantling.
- Dates must be coordinated with KT and adapted to the plant’s operating hours.
- Dismantling must be completed entirely up to the supply lines.
Iiedpfx Aey Dg N Heb Ssa
- All site safety regulations must be observed.
- The equipment is sold as inspected and in its current condition, without any guarantee or warranty for material or cosmetic defects.
Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.
Pakkuja
Professionaalne Müüja
Viimati sees: eelmisel nädalal
Registreeritud alates: 2020
16 Kuulutused internetis
Saada päring
Teie kuulutus on edukalt kustutatud
Ilmnes viga












