AkenepihustusseadeFINITURE
Fensterlackieranlage
Akenepihustusseade
FINITURE
Fensterlackieranlage
fikseeritud hind lisandub käibemaks
900 €
Tootmisaasta
2008
Seisund
Kasutatud
Asukoht
Pöllau bei Hartberg 

Pildid näitavad
Kuva kaart
Andmed masina kohta
- Masina nimetus:
- Akenepihustusseade
- Tootja:
- FINITURE
- Mudel:
- Fensterlackieranlage
- Masina number:
- IMBDS63-52-10-45-2/SP/DC/SB
- Tootmisaasta:
- 2008
- Seisund:
- kasutatud
- Töövõimekus:
- täielikult töökorras
Hind ja asukoht
fikseeritud hind lisandub käibemaks
900 €
- Asukoht:
- Pöllau bei Hartberg, Austria

Helistada
Tehnilised andmed
- Töödetaili kaal (max):
- 120 kg
- Töökõrgus:
- 2 850 mm
- Võimsus:
- 35 kW (47,59 hj)
- Õhuvajadus:
- 24 000 m³/h
- Tihendatud õhu ühendus:
- 6 latt
Pakkumise üksikasjad
- kuulutuse ID:
- A20820642
- Viitenumber:
- 268/7
- Värskendus:
- viimati kuupäeval 23.12.2025
Kirjeldus
The existing window coating line was in full operation until December 19, 2025. The system is currently still connected to the electrical supply network but will be replaced by a new robotic coating system over the turn of the year.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
Duodpfx Asx Npzcja Nep
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.
The objective is to find a suitable subsequent user who will professionally dismantle and remove the complete system on their own responsibility at the beginning of the coming year.
System Concept Description
Loading and unloading of traverses with window frames and sashes takes place via a lifting/lowering station, which allows for ergonomic and process-safe feeding of the system.
Impregnation and priming of the workpieces is carried out in a vertical flooding booth. The coating application is performed using the flooding process via vertically arranged coating nozzles. This is followed by a drip-off and drying zone, where the traverses are guided in an inclined position.
Duodpfx Asx Npzcja Nep
The first drying tunnel has a buffer capacity of approx. 40 traverses. Drying is achieved by means of warm air generated from a hot water system with a supply temperature of approx. 85°C.
A switching unit enables workpieces to be routed either to a second impregnation/priming stage or directly to the subsequent coating section, as required.
The coating section consists of a lifting stand with integrated electrostatic application (E-Statik). Coating is performed on one side only, supplemented by an automated turning unit, allowing workpieces to be returned to the spray system for a repeat coating pass.
The second drying tunnel enables buffering of approx. 50 traverses. Here as well, drying is by warm air supplied by a hot water system at approx. 85°C.
A buffer section after the second drying tunnel with a capacity of about 25 traverses serves as a transfer area to the unloading station.
Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.
Dokumendid
Pakkuja
Märkus: Registreeru tasuta või logi sisse, et saada kogu teave.
Registreeritud alates: 2025
3 Kuulutused internetis
Saada päring
Telefon & Faks
+43 664 3... kuulutused
Need kuulutused võivad samuti teile huvi pakkuda.
Väike kuulutus
Kanzach
1 550 km
Kuiv paternosteri sõrmede liigendusjoon
WEINIG
WEINIG
Väike kuulutus
Saksamaa
1 403 km
Palkide õu
Baljer & ZembrodRUW 1651
Baljer & ZembrodRUW 1651
Väike kuulutus
Herning
1 000 km
WINDOWS
SCM GROUPWINDOR 60
SCM GROUPWINDOR 60
Väike kuulutus
Pardubice
1 124 km
Tech morbidelli
esa gvKVARA DIG.LIGHT 4A MECH.
esa gvKVARA DIG.LIGHT 4A MECH.
Väike kuulutus
Groenlo
1 368 km
Liigendatud teleskoopiline tööplatvorm
JLG600AJ Valid inspection, *Guarantee! Diesel, 4x4 Dr
JLG600AJ Valid inspection, *Guarantee! Diesel, 4x4 Dr
Väike kuulutus
Gondelsheim
1 502 km
Kraanakatus Kraanahall kraana kraanaraja kraanarada
Demag Portalkran KBK 250KGKBKI/II KBK1/2 8x4m 250Kg DC Kettenzug
Demag Portalkran KBK 250KGKBKI/II KBK1/2 8x4m 250Kg DC Kettenzug
Väike kuulutus
Enschede
1 341 km
Helmesmasin äärikumasin
OstasKM 1,2
OstasKM 1,2
Väike kuulutus
Rootsi
399 km
Pelletipress
SalmatecMaxima 700
SalmatecMaxima 700
Väike kuulutus
Kanzach
1 550 km
Optimeerimine ristlõikesüsteem
Paul14 E, KE oder MKL
Paul14 E, KE oder MKL
Väike kuulutus
Aalen
1 459 km
Akna lakkimissüsteem
FINITUREPro Flow Impraegnieranlage
FINITUREPro Flow Impraegnieranlage
Teie kuulutus on edukalt kustutatud
Ilmnes viga








































































































