FAL-i mootorite montaaži- ja kontrolliliin
FAL

Tootmisaasta
2020
Seisund
Kasutatud
Asukoht
Czechowice-Dziedzice Poola
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL-i mootorite montaaži- ja kontrolliliin FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL
FAL

Põhiandmed

Masina nimetus:
FAL-i mootorite montaaži- ja kontrolliliin
Tootja:
FAL
Tootmisaasta:
2020
Seisund:
kasutatud

Hind ja asukoht

Oksjoni algus:
01.11.2026 kell 15:55
Oksjoni lõpp:
31.12.2026 kell 12:00

Asukoht:
Czechowice-Dziedzice, Polen Poola
Helistada

Pakkumise üksikasjad

kuulutuse ID:
A23339912
Viitenumber:
2970001
Värskendus:
viimati kuupäeval 16.11.2026

Kirjeldus

The lot consists of:
(1) FAL Motor Assembly and Testing Line (1)

Technical Details:
FAL Motor Assembly Line 1 – Technical Description
The FAL Motor Assembly Line 1 is a fully integrated production system for the assembly and testing of electric motors, located at the Valeo plant in Poland. The line is designed for high-volume automotive production and combines automated, semi-automated, and manual processes within a continuous material flow layout.

Basic information:
Cycle time: approx. 86 seconds per unit
TRP/OEE: approx. 85%
Total surface area: approx. 855 m²
Process Overview

The line consists of 25 sequential stations covering the complete assembly process from component loading to final packaging and reintegration.

Initial assembly and housing preparation:
OP10: Robot-based component loading
OP20: Shrinking process (heating inner housing and joining stator)
OP30: Cooling tunnel
OP40: Manual assembly of X-ring and D-ring
OP50: Pre-assembly of outer housing

Core assembly and rotor integration:
OP60: Joining inner housing to outer housing
OP70: Rotor magnetization and measurement
OP80: Pre-assembly of A-shield and rotor insertion
OP90: Attaching A-shield to outer housing
OP110: Screwing A-shield

Intermediate assembly and component integration:
OP135: Manual interconnector assembly
OP136FA / OP136PA: Counter ring insertion, cooling cover joining, vent assembly

End-of-line handling and testing:
OP140: Transfer to EOL loop
OP150–190: End-of-line testing
OP230/240: Leak testing (test 1 and test 2)
OP245: Rotation test and EM graver verification
Iisdo Akk Rkspfx Akiji
OP260: Laser marking and stamping

Final assembly and packaging:
OP270: Assembly of plugs, transportation cover, and cap
OP280: Final inspection and packaging
OP290: Reintegration process

Kuulutus tõlgiti automaatselt. Tõlkevigu võib esineda.

Pakkuja

Viimati sees: eelmisel nädalal

Registreeritud alates: 2011

72 Kuulutused internetis

Trustseal icon

Telefon & Faks

+49 8151 ... kuulutused